General
Program Performance Profile (PPP)
;
Program Performance Profile (PPP)
SYSTEM – INPUTS AND PROCESSES
S.3. The laboratories are properly lighted and well ventilated.
S.4. Each laboratory room has at least 2 exit doors that open outward.
S.5. There is a laboratory for shop work for specific technologies.
S.6. There is a computer laboratory with at least 15 usable computer units and printer.
IMPLEMENTATION
I.2. Safety and precautionary measures are implemented.
I.3. Usable fire extinguishers are accessible to staff and students.
I.4. Laboratory Operation Manuals for the faculty and students are provided in each laboratory.
I.7. A student’s access to a computer is at least 15 hours/semester/subject.
I.9. A well-equipped Multimedia Center is maintained.
I.10. Gas, water and electricity are utilized for class laboratory activities.
I.12. Laboratory equipment, supplies and materials are kept in separate stock rooms.
OUTCOME/S
O.1. The laboratories and shops are well equipped, functional and are conducive to learning.
SYSTEM – INPUTS AND PROCESSES
S.1. The equipment, instruments and materials needed in the classroom are available.
S.3. Varied computer software are available.
IMPLEMENTATION
I.1. Equipment are well-maintained.
I.2. Laboratory supplies and materials are wisely utilized.
I.3. Licensed computer software are installed and utilized.
OUTCOME/S
O.1. The laboratory equipment, supplies and materials are sufficient and wisely utilized.
SYSTEM - INPUTS AND PROCESSES
S.1. A laboratory technician/assistant is available for the proper upkeep of the laboratories.
IMPLEMENTATION
I.1. The institution keeps the laboratories neat, clean and orderly.
I.2. Laboratory supplies and materials are regularly replenished/replace whenever applicable.
I.4. The laboratory equipment /instrument are in good condition and are periodically calibrated.
I.5. All equipment are coded, listed and inventoried.
I.6. Waste disposal is efficiently and effectively managed on campus.
I.7. The following are properly maintained by trained/appropriate personnel/technicians:
I.7.1. natural science laboratory;
I.7.6. general education laboratory; and
I.7.7 others (please specify) ________________.
OUTCOME/S
O.1. The laboratories and shops are functional and are properly maintained.
SYSTEM – INPUTS AND PROCESSES
S.1. Specific program requirements (listing of materials and equipment as per CMO) are in accordance with guidelines/policies embodied in issuances, e.g. CMOs.
S.2. There is an approved Project Procurement Management Plan (PPMP).
S.3. There is an approved Annual Procurement Plan (APP) for laboratory equipment, supplies and materials.
IMPLEMENTATION
I.1. The institution implements the special provisions as listed in the CMO.
OUTCOME/S
O.1. The special provisions in the CMO of the program are complied with.